bionproduction.blogg.se

Grandview resorts
Grandview resorts










grandview resorts

^ a b c Illia, Tony (December 19, 2003)."Contractor to pour foundation for time share tower on April 25". Clark County Department of Business License. The new tower would increase Grandview's units from 1,556 to 1,856. The new tower was under construction as of September 2013, and was expected for completion in early 2014. Berkley Group planned for a total of 10 towers on the 27-acre property, with more than 1,500 units completed up to that point. įoundation work for a new 20-story tower – the first one to be built since 2009 – was scheduled to begin on April 25, 2012. By December 2010, Grandview featured 1,400 units, with 400 planned to open the following month. In 2010, the adjacent South Point Hotel Casino and Spa opened the Grandview Lounge, named after the timeshare property. By that point, the project's first two towers, with 196 units each, had been completed and sold out, while a majority of the third tower's planned 240 units had also sold. The property would ultimately feature over 2,000 units, and was expected to become the largest timeshare complex in the United States. In May 2005, Grandview's owner, the Fort Lauderdale-based Eldorado Resorts Corporation, announced that the property planned to build 10 timeshare towers over the next several years, with approximately one tower being constructed each year. Construction was expected to last a year, and was estimated at $21 million. In November 2004, Penta began construction on a third tower, 12 stories high with 120 units.

grandview resorts

A total of 300 construction workers were expected to work on the project, which would require 1,563 truckloads of concrete. Īs of April 2004, the project's first tower, as well as a sales building and property amenities, were scheduled for completion in March 2005, with the second tower expected to be completed four months later. There were tentative plans to add eight additional towers over the next 10 years, for a total of 1,600 units. The project would initially consist of two towers, both 12 stories in height, with a total of 384 units. Grandview was designed by Allen + Philp Architects, based in Scottsdale, Arizona. History Ĭonstruction began in 2003, with Penta Building Group as general contractor and Berkley Group, of Fort Lauderdale, Florida, as the developer. The property is owned by Eldorado Resorts Corporation, and consists of eight buildings, ranging between 12 and 20 floors, with a total of 2,256 units. The Grandview at Las Vegas is a timeshare property resort located on 26.49 acres (10.72 ha) of land at 9940 South Las Vegas Boulevard, south of the Las Vegas Strip, in Enterprise, Nevada.












Grandview resorts